WELCOME TO OUR BLOG

We're sharing knowledge in the areas which fascinate us the most
click
May 20th, 2026

Compliance & Testing Guide for TDM750T14-13K5IT: Applying IEC 62477-1, IEC 61000-6-4, and IEC 61000-6-2 in Battery Test and Energy-Recovery Systems

Learn how the TDM750T14-13K5IT bidirectional DC-DC power module supports compliance-focused battery testing, energy recovery, and power aging projects. This guide maps IEC 62477-1, IEC 61000-6-4, and IEC 61000-6-2 requirements to selection, integration, EMC planning, and RFQ preparation.
May 13th, 2026

PFS1500 Compliance & Testing Guide: Applying IEC 60601-1, IEC 60601-1-2, and IEC 62368-1 for Medical and Industrial Power Projects

PFS1500 is a 1500W AC/DC power supply series for industrial and medical equipment, combining 90–264Vac universal input, IEC/UL 60601-1 and IEC/UL 62368-1 approvals, IEC 60601-1-2 Ed.4 EMC performance, 2xMOPP isolation, PMBUS, remote sense, and current sharing. It helps OEMs and integrators shorten compliance review, simplify power architecture, and move faster from design validation to RFQ.
May 6th, 2026

ONV-H3064PS & ONV-H3108PS Compliance and Testing Guide: EN 62368-1, FCC Part 15 Class B, and RoHS for CCTV, AP, VoIP, and Access Control Projects

Compare ONV-H3064PS and ONV-H3108PS for CCTV, wireless AP, VoIP, and access control deployments. This compliance-focused guide explains how these unmanaged Gigabit PoE switches align with EN 62368-1, FCC Part 15 Class B, and RoHS requirements, while helping system integrators, panel builders, procurement teams, and electrical engineers evaluate port count, PoE budget, installation fit, and RFQ readiness.
April 29th, 2026

Compliance & Testing for ONV-H3016 and ONV-H3024: Using EN 62368-1, FCC Part 15 Class B, and RoHS to Reduce Procurement Risk

Explore how the ONV-H3016 and ONV-H3024 unmanaged gigabit Ethernet switches help system integrators and panel builders align with EN 62368-1, FCC Part 15 Class B, and RoHS requirements. This blog explains key compliance points, practical application fit, and how these 16-port and 24-port switches reduce sourcing risk for surveillance, campus, factory, and commercial network projects.
April 22nd, 2026

7832-27 & 7832-33 Compliance and Testing Guide: Validating 10G SFP+ BiDi Links for IEC 60825-1, IEEE 802.3ae, and SFF-8431

Explore how TPS ELECTRIC LLC 7832-27 and 7832-33 10G SFP+ BiDi transceivers support compliance and validation for IEC 60825-1, IEEE 802.3ae, and SFF-8431. This guide covers 10Gb/s single-fiber links, 20km SMF transmission, DDM monitoring, optical safety, interoperability, and practical testing steps for system integrators, panel builders, and engineers.
April 15th, 2026

YB-T Series Compliance & Testing Guide: Applying IEC 60939-3, IEC 60335-1, and UL 1283 in Home Appliances and Compact Equipment

YB-T Series is a compact single-phase EMI line filter for home appliances and general equipment. Designed for 115/250V AC systems, it helps suppress common-mode and differential-mode conducted noise, making it a practical choice for appliance EMI compliance, cleaner AC input design, and RFQ-ready filter selection.
April 8th, 2026

Compliance & Testing for YX-G Series (Terminal Bolt): How US Panel Builders Map IEC 60939-3, UL 1283, and IEC 61000-6-4 to Three-Phase EMI Filter Selection

Need a practical path to EMC-ready three-phase power entry? This guide shows how the TPS ELECTRIC LLC YX-G Series (Terminal Bolt) helps US panel builders and integrators align three-phase EMI filter selection with IEC 60939-3, UL 1283, and IEC 61000-6-4 for inverters, three-phase motor drives, UPS/SMPS, power supplies, and industrial automation equipment.
April 1st, 2026

CP1500 Series Compliance & Testing Guide: Applying IEC 60601-1-2, EN/UL 60335-1, and IEC/UL 62368-1 in AGV, Medical Cart, and Industrial Battery Charger Projects

Explore how the CP1500 Series helps US OEMs and integrators simplify compliance and testing for AGV charging modules, medical carts, and industrial battery systems. This 1500W AC/DC battery charger platform combines 90–264Vac input, LiFePO4/NCM charging curves, CAN communication, and compliance-ready integration planning for faster RFQs.
Get in Touch with TPS
Name*
Business Email*
Company Name
Country/Region
Inquiry Type*
Application / Industry
What problem are you facing right now?
What are you trying to achieve?
Target Timeline
Budget Range
We use Cookie to improve your online experience. By continuing browsing this website, we assume you agree our use of Cookie.